New Setup Plumbing Help

dustinc

Active Member
View Badges
Joined
Jan 26, 2010
Messages
308
Reaction score
320
Location
Waxahachie, TX
Rating - 0%
0   0   0
I have a new Planet 120 that is being delivered tomorrow, and I'm working on my plumbing design. It is an internal overflow box that is pre-drilled with 4 holes (2 x 1" & 2 x 3/4"). It is obviously ran this way to run 2 drain and 2 return. I've ran Herbie before with great success, but I like the idea of the extra failsafe of the bean animal setup. I've thought about running 1 of the 3/4" drains as my main drain and the 2 1" pipes as the secondary and emergency. I plan on a 1000gph return pump with the goal of about 500 gph actual turnover between the sump and tank.

Has anyone done this and what are your thoughts?

Also, I could run Herbie and run the float switch for my return in the overflow box to shut off the return if the drains have an issue as well.
 

Managing real reef risks: Do you pay attention to the dangers in your tank?

  • I pay a lot of attention to reef risks.

    Votes: 123 43.0%
  • I pay a bit of attention to reef risks.

    Votes: 98 34.3%
  • I pay minimal attention to reef risks.

    Votes: 45 15.7%
  • I pay no attention to reef risks.

    Votes: 15 5.2%
  • Other.

    Votes: 5 1.7%
Back
Top