I'm getting ready to plumb my 40g and the ball valve and unions for the 1 1/2" overflow pipe are pretty heavy. I'll put one union in the back close to the bulkhead and plan on putting the ball valve and other union on the other end in the sump. Am I going to need to add extra support to the PVC pipe to keep things stable? The ball valve and union above the sump will be vertical and I'm concerned about the strain they will put on the PVC pipe that extends from the back of the stand. I had no idea how heavy these things were! Thanks in advance for your help!