Cut and painted the lumber for the control board and laid out the controllers. Drilling all the holes for grommets. I am about halfway done but taking a break to watch the football game
Built and painted the skimmer stand. Still waiting on a bushing because the skimmer water intake is metric
Rough cut the piping under the stand that connects to lines running to the basement. I am awaiting some true unions and fittings to attach the return line to the locline nozzles.
Built and painted the skimmer stand. Still waiting on a bushing because the skimmer water intake is metric
Rough cut the piping under the stand that connects to lines running to the basement. I am awaiting some true unions and fittings to attach the return line to the locline nozzles.