Well good news a build thread will be coming soon. Here is the plan.......
I am going to do a 96x36x24 peninsula tank. 3 1.5" drains on an external overflow with 2 1" returns feed by my Vectra m2s one on each line. Sump is a Synergy SK60 with dual clarisea rollers with a Royal Exclusiv supermarin 250 (upgrading from my lovely double cone 200 as I do not think it would be enough for the new volume).
Currently I have 4 MP40s and 2 MP60s for my XXL750 that I will be bringing over. I was thinking that I wanted to put 4 MP40s on the return side and 2 MP60s on the far side, BUT I am up in the air on a possible closed loop instead of the MP60s. The closed loop drains would be placed on the return side feeding 2 1" returns on the far side floor. I was thinking 1ft from the end and 1ft spacing from walls and each other. I have never had a closed loop and was wondering will this provide enough flow being fed by a Vectra L2? I would like to not have any pumps on the far side. With the closed loop a foot off the end would this create dead spots with them aimed back at the return side. I need some help here with this or should I just stick with the MP60s.
If I do the closed loop, I could use the MP60s on the return side and eliminate the MP40s. Any thoughts on that?
I am getting ready to place the order on the tank in a few days and need to figure out if I am going a closed loop so I can have it drilled. Feedback please as I am not very experienced as it's only been my costly hobby for a little over a year now and do not want to make an error as the wife has said this is the "last one". We will give it a few years lol.
I am going to do a 96x36x24 peninsula tank. 3 1.5" drains on an external overflow with 2 1" returns feed by my Vectra m2s one on each line. Sump is a Synergy SK60 with dual clarisea rollers with a Royal Exclusiv supermarin 250 (upgrading from my lovely double cone 200 as I do not think it would be enough for the new volume).
Currently I have 4 MP40s and 2 MP60s for my XXL750 that I will be bringing over. I was thinking that I wanted to put 4 MP40s on the return side and 2 MP60s on the far side, BUT I am up in the air on a possible closed loop instead of the MP60s. The closed loop drains would be placed on the return side feeding 2 1" returns on the far side floor. I was thinking 1ft from the end and 1ft spacing from walls and each other. I have never had a closed loop and was wondering will this provide enough flow being fed by a Vectra L2? I would like to not have any pumps on the far side. With the closed loop a foot off the end would this create dead spots with them aimed back at the return side. I need some help here with this or should I just stick with the MP60s.
If I do the closed loop, I could use the MP60s on the return side and eliminate the MP40s. Any thoughts on that?
I am getting ready to place the order on the tank in a few days and need to figure out if I am going a closed loop so I can have it drilled. Feedback please as I am not very experienced as it's only been my costly hobby for a little over a year now and do not want to make an error as the wife has said this is the "last one". We will give it a few years lol.