A brief welcome to the anticipated slow going.. couple bad cards were dealt since last year so unfortunately the project got delayed. However this is the space in the addition to be utilized. Tank is going to be ordered this week and likely to be 7’x30”x30”. The wall framing will expose 2 sides with the sump and water stations in the basement directly below. Don’t mind the mess.