- Joined
- Aug 10, 2016
- Messages
- 851
- Reaction score
- 424
Over the weekend i worked on the doors. I splined the panels into the frames for the 2 center doors. If had not run out of glue i would have built the 2 side doors and installed the 4in tongue and groove on the doors. I will be finishing the doors up soon. I did get the front doors hung.
The 2 center doors and the ends will be framed tongue and groove. The 2 outside front doors are louvered for air. Left side will house a chiller. I also installed the petitions to seperate the chiller section from the sump, and the sump from equipment.