Well due to some issuses with my custom drop tank like flow being a real pain and the stand setteling and becoming unlevel I just decided it's better to swap tanks then deal with rubbermaids and livestock etc.... Lots more to come..
I got 30 min to finish cutting this tank and get it loaded in my truck before lunch is over... Be back soon with much more....
I got 30 min to finish cutting this tank and get it loaded in my truck before lunch is over... Be back soon with much more....