I'm working on my first tank with an overflow and picked up a modular marine overflow. Plumbing the inside pipes around the bulkheads coming in from the tank has been challenging. Would this work for a beananimal style?
Left most is basically impossible to put anything in, so I figure it will be full syphon and just leave it open as is.
Middle is lifted up slightly and then on a 90 to get it out of the way of the bulkhead coming in.
Rightmost is double 90s put together with a small section of pipe sticking up to make it the emergency overflow. Not sure how to judge how high the pipe should be.
dry fit pic:
Left most is basically impossible to put anything in, so I figure it will be full syphon and just leave it open as is.
Middle is lifted up slightly and then on a 90 to get it out of the way of the bulkhead coming in.
Rightmost is double 90s put together with a small section of pipe sticking up to make it the emergency overflow. Not sure how to judge how high the pipe should be.
dry fit pic: