I finally have some time to work on the tank .I decided not to run two pumps right now but plumbed a tee in the return line for one if I decide I want one in the future. I'm thinking I will. Also plumbed in a manifold with two 1/2 inch ball valves for extra equipment. Hoping to start setting up the RODI system tomorrow.